The telephone wires were buried underneath the table.
6 to 12 inches
Phone and cable are usually put in with a plow (rather than a trencher or backhoe) in this area. The national electrical safety code doesn't have a minimum depth for communications lines, but 6 to 12 inches is probably typical.