INVERSE PROPORTION:
*If the painting should be finished in 2 days, then 10 men will be hired.
(My solution):
METHOD 1:
- 4 men × 5 days = N × 2 days
- 4 men × 5 / 2 (how many man are needed to paint the room in 1 day)
*Re-check
- 4 × 5 = 10 × 2
- (4 × 5) = 20 = (10 × 2) = 20
METHOD 2