A manufacturer ha 750 meter of cotton and 1000 meter of polyeter. Production of a weathirt require 1 meter of cotton and 2 meter of polyeter, while production of a hirt require 1. 5 meter of cotton and 1 meter of polyeter. The ale price of a weathirt and a hirt are 30€ and 24€, repectively. What are the number of weathirt (S) and the number of hirt (C) that maximize total ale?.